Sewerage networks project in southern Hofuf schemes and other schemes in Al-Ahsa Governorate, part one(Phase VII) Part Two
The project contains water networks of main and subsidiary lines of fiberglass with diameters (200:700) mm with a total length of 3 km, in addition, to control rooms and home connections, network tests, and connections on the existing lines with the construction of the main and subsidiary inspection rooms. Construction of the pumping station to serve Hayy area Engineers, including all civil, mechanical, and electrical works.