Sewerage networks project part three

Sewage networks project in the southern Hofuf schemes and other schemes in Al-Ahsa Governorate part three(Phase VII) Part Two

The project contains water networks of main and subsidiary lines of fiberglass with diameters (200:700) mm with a total length of 40 km, in addition, to control rooms and home connections. Network tests and connections on the existing lines with the establishment of main and subsidiary inspection rooms