The remaining deferred items from the water networks project in various areas in the governorates of Hafr Al-Batin and Qaisumah (Phase VII) Part Two
The project contains water networks of main and subsidiary lines, polyethylene lines with diameters (255-160-110), and ductile lines with a diameter of 800 mm with a total length of 130 km, in addition to control rooms and home connections.